6. Oil Cooler Water Pipe (Oil Cooler Model)
•
Remove the water pipe bracket bolt.
•
Remove the inlet manifold fixing nut.
7. Inlet Manifold
•
Remove the manifold fixing bolt and nut.
6A1-9-1.tif
INSTALLATION
7. Inlet Manifold
•
Tighten the fixing bolts and nuts to the specified
torque.
Bolt & Nut
6. Oil Cooler Water Pipe (Oil Cooler Model)
•
Install the water pipe and tighten the manifold with
water pipe.
•
Tighten the pipe bracket bolt of cylinder head rear
side.
5. Oil Level Gauge Guide Tube
•
Install the guide tube and tighten the manifold with
guide tube.
6A1-9-2.tif
4. Injection Pipe
•
Connect the injection pipe and tighten flare nut to the
specified torque.
Flare nut torque
•
Install the pipe clip to the original position.
3. PCV Hose
2. Air Intake Duct
1. Vacuum Hose
6A1-9-3.tif
•
Connect the battery ground cable.
•
Pour coolant.
•
Start the engine and check coolant leakage.
4JB1/4JB1T/4JB1TC/4JG2 – ENGINE 6A1 – 9
19(1.9/14)
29(3.0/22)
N∙m(kg∙m/lb∙ft)
N∙m(kg∙m/lb∙ft)