INSTALLATION
4. Thermostat
3. Gasket
2. Outlet Pipe
•
Connect outlet pipe and tighten bolts to the specified
torque.
6B-10-1.tif
1. Switch Harness
•
Install switch harness.
•
Install battery ground cable.
•
Pour coolant.
•
Start the engine and check coolant leakage.
ENGINE COOLING 6B - 11
N∙m (Kg∙m/lb∙ft)
19 (1.9/14)