Isuzu NHR 4J Series Workshop Manual page 177

Table of Contents

Advertisement

6A1 – 42 4JB1/4JB1T/4JB1TC/4JG2 - ENGINE
4JG2 Cylinder Head Gasket Thickness
Gasket Grade Mark
A
B
C
6A1-42-1.tif
NOTE:
The difference between the highest measured piston
head projection and the lowest measured piston head
projection must not exceed 1.0 mm (0.039 in).
19. Cylinder Head Assembly
1) Install the dowel in cylinder block.
2) Install the cylinder head gasket with top mark up.
3) Clean up cylinder head lower surface and cylinder
body upper surface.
4) Install the cylinder head as softly.
5) Apply engine oil to screw and seat of cylinder head
bolts.
6) Tighten the cylinder head bolts to the specified torque
in three steps following the numerical order shown in
6A1-42-2.tif
the illustration.
Cylinder Head bolts Torque
49 (5.0/36)
18. Push Rod
Apply engine oil to push rod and in to the cylinder
head.
17. Rocker Arm shaft
1) Loosen all adjusting screws.
2) Position the rocker arm shaft with the large oil hole
(4ø) facing the front of the engine.
6A1-42-3.tif
Piston
Projection
0.658 - 0.713
(0.026 - 0.028)
0.713 - 0.759
(0.028 - 0.030)
0.759 - 0.814
(0.030 - 0.032)
1st Step
2nd Step
60 - 75°
mm (in)
Gasket Thickness
(Reference)
1.60
(0.0630)
1.65
(0.0650)
1.70
(0.0670)
N∙m (kg∙m/lb∙ft)
3rd Step
60 - 75°

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents