Inspection On Qosiii System Operation - Isuzu NHR 4J Series Workshop Manual

Table of Contents

Advertisement

Inspection on QOSIII System Operation

Inspection on Quick Heating Operation
I
1. Disconnect thermo-sensor connection on the
thermostat housing.
6D7-5-1.tif
2. Connect the circuit tester between glow plug and
engine earth.
3. Inspect the following items with starter switch set to
ON position (but do not start the engine).
1) The glow indicator shall light for 1 ~ 6 sec.
2) The circuit tester shall indicate power supply voltage
for 9 ~ 13 sec.
If above specifications are not satisfied, inspect wire
harness, glow relay and thermo-sensor. If satisfied,
inspect glow plug.
6D7-5-2.tif
II Inspection on Quick Heating Afterglow Operation
1. Disconnect thermo-sensor connection on the
thermostat housing.
6D7-5-3.tif
2. Connect the circuit tester between glow plug and
engine earth.
3. Inspect the following item with start the engine.
1) The circuit tester shall indicate power supply voltage
for about 5 seconds.
If above specification is not satisfied, inspect battery
voltage, engine earth, wire harness and starter switch
"st" signal to control unit.
If satisfied, inspect wiring harness, engine earth and
starter switch.
6D7-5-4.tif
III Inspection on Afterglow Operation
1. Disconnect thermo-sensor connection on the
thermostat housing.
6D7-5-5.tif
QOSIII PREHEATING SYSTEM 6D7 – 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents