Radiator Installation - Isuzu NHR 4J Series Workshop Manual

Table of Contents

Advertisement

6B - 14 ENGINE COOLING
INSTALLATION
7. Radiator Assembly
Install the radiator
6. Cushion Rubber
Install cushion rubbers on both sides of radiator
bottom.
Install radiator assembly with hose, taking care not to
damage the radiator core by a fan blade.
5. Condenser
4. Radiator Stay
3. Air Intake Duct
6B-13-1.tif
Connect the Duct and tighten clip securely.
2. Radiator Hose
Connect inlet hose and outlet hose to the engine.
Connect battery ground cable.
Pour coolant
Pour coolant up to filler neck of radiator, and up to
MAX mark of reservoir tank.
1. Reservoir Tank Hose & Bypass Hose
Start engine to warm up, and check for coolant level.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents