Isuzu NHR 4J Series Workshop Manual page 168

Table of Contents

Advertisement

Mount new timing belt on pulleys in the following steps.
Crankshaft timing pulley
Timing pulley
Pump pulley
Set the belt on crankshaft timing pulley and hold with
one hand.
Stretch and pass the belt round each pulley with the
other hand.
After passing it round injection pump pulley, install
tensioner while taking care not to slacken the belt.
6A1-33-1.tif
CAUTION
On completion of belt passing, make sure that the
setting mark on crankshaft timing pulley is set.
If not set, reset the mark and repeat the belt passing.
Remove tension adjust, lever mounting bolt, and
loosen the fulcrum bolt to such extent that the lever is
movable.
Hung a spring balance from the end hole of tension
adjust lever, and with the balance pulled down with
9kg., loosen once the tensioner mounting bolt and
6A1-33-2.tif
there retighten it.
Turn the crankshaft by 45° counterclockwise to shift
belt slackness on to the tensioner.
Again hang the spring balance from the end hole of
tension adjust lever and pull it down with the specified
force. Under this condition, loosen tensioner mounting
bolt to absorb belt slackness and retighten is to
specified torque.
Belt
Tension
6A1-33-3.tif
Bolt
Fix the tension adjust lever.
6A1-33-4.tif
4JB1/4JB1T/4JB1TC/4JG2 – ENGINE 6A1 – 33
!
→ camshaft
"
→ Idle pulley
$
→ tensioner
76 (7.8/56)
#
→ Injection
%
N∙(kg/lb)
98 - 118 (10 - 12/22 - 26)
N∙m (kg∙m/lb∙ft)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents