Water Pump Installation - Isuzu NHR 4J Series Workshop Manual

Table of Contents

Advertisement

6B - 8 ENGINE COOLING
INSTALLATION
9. Water Pump Assembly
Set O-ring in water pump body groove.
Install water pump assembly, and tighten to specified
torque.
Pump Fixing Bolt Torque
8. Timing Pulley Lower Cover
6B-7-1.tif
Install timing pulley lower cover, and tighten to
specified torque.
Cover Fixing Bolts Torque
7. Timing Pulley Upper Cover
Install timing upper cover, and tighten to specified
torque.
Cover Fixing Bolts Torque
6. Crankshaft Damper Pulley
Install crankshaft damper pulley, and tighten to
specified torque.
Pulley Bolt Torque
5. AC Generator Drive Belt
4. A/C Compressor Drive Belt
3. Power Steering Pump Drive Belt
Install the drive belts and adjust belt
Check drive belts for wear or damage, and replace
with new ones as necessary. Check belts for tension,
and adjust as necessary.
Push the middle of belts with a force of 98 N
(10 kg/22 lb) and check each bolt for deflection.
Standard deflection
6B-7-2.tif
AC Generator drive belt
A/C compressor drive belt
Power Steering drive belt
6B-7-3.tif
N∙m (Kg∙m/lb∙ft)
20 (2.0/14)
N∙m (Kg∙m/lb∙in)
8 (0.8/69)
N∙m (Kg∙m/lb∙in)
8 (0.8/69)
N∙m (Kg∙m/lb∙in)
19 (1.9/14)
Initial tension
8 – 12
(0.31-0.47)
mm (in)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents