Engine Installation - Isuzu NHR 4J Series Workshop Manual

Table of Contents

Advertisement

INSTALLATION
15. Engine Assembly
Position engine mountings by using hoist.
14. Support Rubber
After all fixing bolts (left:two bolts, right:two bolts) were
inserted to every holes, and engine asm and tighten
fixing bolts to the specified torque.
6A1-103-1.tif
13. Front Exhaust Pipe
Connect the exhaust pipe and tighten nut to the
specified torque.
Exhaust Pipe Nut Torque
Install the exhaust pipe stay and tighten bolt nut to the
specified torque.
Stay Bolt Nut Torque
6A1-103-2.tif
12. Vacuum Pump Hose (Exh. Brake Model)
Connect the vacuum hose to vacuum tank side and
magnetic valve side.
6A1-103-3.tif
11. Actuator Vacuum Hose (Exh. Brake Model)
Connect the vacuum hose to actuator.
6A1-103-4.tif
4JB1/4JB1T/4JB1TC/4JG2 – ENGINE 6A1 – 103
40 (4.1/30)
69 (7.0/51)
40 (4.1/30)
N∙m (kg∙m/lb∙ft)
N∙m (kg∙m/lb∙ft)
N∙m (kg∙m/lb∙ft)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents