Isuzu NHR 4J Series Workshop Manual page 288

Table of Contents

Advertisement

10. Fuel Hose
Connect the fuel feed hose and fuel return hose.
Connect the leak off hose.
9. Injection Pump Control Cable
1) Install the control wire to the engine control lever.
2) Hold the accelerator lever in the fully closed position
and stretch the control cable in the direction indicated
by the arrow to remove any slack.
3) Tighten the accelerator cable bracket bolt.
8. Air Intake Duct
6C-28-1.tif
7. Noise Cover Spacer
6. Noise Shield Cover
6C-28-2.tif
5. AC Generator Drive Belt
Install AC generator drive belt and adjust belt tension.
Depress the drive belt mid-portion with a 98 N (10
kg/22 lb) force.
Drive Belt Deflection
Install fixing bolt and tighten bolts to the specified
torque.
6C-28-3.tif
Generator Fixing Bolt
Adjust Plate Fixing Bolt
6C-28-4.tif
ENGINE FUEL 6C - 29
8 (0.31) - 10 (0.39)
N∙m (Kg∙m/lb∙ft)
40 (4.1/30)
N∙m (Kg∙m/lb∙ft)
19 (1.9/14)
mm (in)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents