Isuzu NHR 4J Series Workshop Manual page 252

Table of Contents

Advertisement

Generator Fixing Belt Torque
Adjust Plate Fixing Belt Torque
A/C Idler Pulley Lock Nut Torque
6B-8-1.tif
P/S Idler Pulley Lock Nut Torque
2. Cooling Fan Assembly
Mount fan pulley and cooling fan assembly on the
water pump and tighten to the specified torque.
Fan Pulley Nut Torque
1. Fan Shroud
Install the fan shroud and reservoir tank hose and
bypass hose.
Connect the battery ground cable.
Pour coolant.
Start the engine and check coolant leakage.
6B-8-2.tif
ENGINE COOLING 6B - 9
N∙m (Kg∙m/lb∙ft)
40 (4.1/30)
N∙m (Kg∙m/lb∙ft)
19 (1.9/14)
N∙m (Kg∙m/lb∙ft)
27 (2.8/20)
N∙m (Kg∙m/lb∙ft)
27 (2.8/20)
N∙m (Kg∙m/lb∙in)
8 (0.8/69)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents