Oil Pan Installation - Isuzu NHR 4J Series Workshop Manual

Table of Contents

Advertisement

6A1 – 50 4JB1/4JB1T/4JB1TC/4JG2 - ENGINE
INSTALLATION
4. Oil Pan Assembly
Apply the recommended liquid gasket or its equivalent
to the No.5 bearing cap arches, the grooves, and the
timing gear case arches at the positions shown in the
illustration.
6A1-50-1.tif
Fit the gasket rear lipped portion into the No.5 groove.
Be absolutely sure that the lipped portion in fitted
snugly in to the groove.
Install the oil pan to the cylinder body.
Tighten the oil pan bolts to the specified torque.
Oil Pan Bolt Torque
6A1-50-2.tif
3. Stiffener and Space Rubber
Install the space rubber.
Install the stiffener left side and right side tighten bolt
to the specified torque.
Engine body Side
Clutch Housing Side
Install exhaust pipe bracket.
2. Engine Mount Bolts
Install the mount bolts and tighten to the specified
torque.
Mount Bolt Torque
Install the oil hose to oil pan.
1. Vacuum Pump Oil Hose
Pour engine oil
Connect battery ground cable.
Start the engine and check coolant leakage.
N∙m (kg∙m/lb∙ft)
19 (1.9/14)
N∙m (kg∙m/lb∙ft)
37 (3.8/27)
N∙m (kg∙m/lb∙ft)
78 (8.0/58)
N∙m (kg∙m/lb∙ft)
40 (4.1/30)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents