Isuzu NHR 4J Series Workshop Manual page 129

Table of Contents

Advertisement

6A – 62 GENERAL ENGINE MECHANICAL
8. Piston and Connecting Rod
1) Try to insert the piston pin into the piston pin hole with
normal finger pressure.
Weigh each piston and connecting rod assembly.
Select piston and connecting rod combinations so that
the weight variation of the different assemblies is held
within the specified limits.
2) Clamp the connecting rod in a vise.
Take care not to damage the connecting rod.
3) Use a pair of pliers to install the piston pin snap ring to
the piston.
NOTE:
When changing piston/connecting rod combinations,
6A-62-1.tif
do not change the piston/piston pin combination.
4) Install the piston to the connecting rod.
The piston head front mark
"ISUZU" casting mark
direction.
6A-62-2.tif
5) Apply a coat of engine oil to the piston pin and the
piston pin hole.
Use your fingers to force the piston pin into the piston
until it makes contact with the snap ring.
6A-62-3.tif
6) Use your fingers to force the piston pin snap ring into
the piston snap ring groove.
Check that the connecting rod moves smoothly on the
piston pin.
6A-62-4.tif
Variance in weight
after assembly
"
Less than 3
(0.1058)
!
and the connecting rod
must be facing the same
g (oz)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents