Preliminary Operations - Aastra AXD Installation And Maintenance Manual

Aastra 5000 server installation and maintenance manual
Table of Contents

Advertisement

Hardware operations:
• Installing cabinets
• Handling cards.
Software operations:
• Starting and presetting the installation
• Accessing Aastra Management Portal (User interface).
• Massive import from the massive creation form.
6.2.1

Preliminary operations

6.2.1.1
Site inspection
To ensure that the system has the correct conditions to function properly, check the site
before you start installing the iPBX.
Here is a list of points to check:
• Location
• Environment
• Space requirement
• Electrical installation.
6.2.1.2
Location
• Unpacking, installation, operation, service, and storage
The location must be large enough to host the iPBX and a worktable. This table will be
used to install a telephone set, a management console, and all the other peripheral
equipment.
• Main distribution frame and battery
Check that there is sufficient space for the switching rack and battery no more than
4 meters from the iPBX cabinet. Both 5 m and 10 m RJ45 connection cables are
available.
Follow the supplier's instructions concerning the location of the battery.
• Minimum clearance
A minimum clearance is required for air circulation:
- 55 mm on the left side and at the back for AXD, AXL, AXS, AXS12 and AXS6
AMT/PTD/PBX/0058/4/6/EN
Page 310
01/2011
Installation and Maintenance Manual - Aastra 5000
Installation and activation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

AxlAxsAxs125000Axs6

Table of Contents