12 July '86
5.
Mount the drum shoe [A] on the shaft and with the front edge 240 mm
from the front of the shaft.
of the machine.
6.
Reinstall all corona units.
7.
Install the drum stay and lower the top unit.
8.
Connect the positive lead of the digital multimeter to the red shoe lead
[B]. Connect the negative lead of the multimeter and the black shoe
lead [C] to ground.
Set the meter for dc µA or ac µA depending on the corona current to
9.
be measured.
Note: Use SP 11 and 12 to turn on the coronas.
Route the wire out through the left side
3-80