CYLINDER HEAD/VALVES
the air cleaner case to the stay with the bolt.
Install the air cleaner stay and five 6 mm flange bolts.
the 6 mm
bolts in crisscross pattern in two or
more steps.
TORQUE: 10-14 N'm
11.0-1.4
1-10
ft-Ibl
Make sure that the oil line is not cloggled.
Install the oil line
the oil pipe bolts socket head bolts and
washers.
CAUTION
the oil pipe boits.
(2) 8
mm OIL PIPE
BOLT (SILVER)
(1)
8
mm OIL PIPE BOLT (BLACK)
(6)
SEALING WASHER
(5) Oil PIPE
(4) 6
mm SH BOLT
~
(101 SEALING WASHERS
(9)
COPPER WASHER
(8)
SEALING
WASHERS
4·16).
the cylinder head cover side is black
the oil pipe
the right
attadling bolts at the oil pipe brack·
the three oii
the valve clearance (page 3·7).
Install the heat insulator and fuel tank
et.
TORQUE VALUES:
8
mm:
8-12
N'm
10.8-1.2 kg·m, 6-9
ft·lb)
12
mm: 18-22 N·m
11.8-2.2
13-16 ft·lbl
• The 8 mm
because its oil hole
crankcase cover side.
• Install the oil
bolts to the correct positions.
the
8
mm oil
bolts are interchanged with each other,
engine
result.
6.. 15