Completing Heater Installation; Preparing For Commissioning - Rinnai RIB2310MN Operation & Installation Manual

Gas log flame fire
Table of Contents

Advertisement

COMPLETING HEATER INSTALLATION

PREPARING FOR COMMISSIONING

D
E
C
G
Step 1. Removing the Burner Box Glass
Loosen but do not remove the two retaining screws
the burner box glass panel in place, completely unscrew and remove the two retaining screws
burner box glass clamp
damaged.
Step 2. Unpacking Log Set & Granules Satchel
There are two items shipped inside the burner box of the heater engine, these are the log set
granules
. These items are now accessible for removal.
H
The satchel containing the burner granules
contains the log set. Ensure that you locate and remove the satchel before discarding the
IMPORTANT
packaging material.
Carefully unpack the five logs
return logs to the packaging
safely aside where they can not get damaged. If ANY damage is evident on the logs DO NOT continue with
H
installation and contact your supplier for advice.
Rinnai Australia
. Then lift burner box glass panel
E
from the packaging material
G
for safe keeping. After inspection place the logs and the burner granules satchel
F
B
F
for the bottom burner box glass clamp
A
away and place it safely aside where it can not get
C
is taped to the outside of the foam packing that
H
and inspect each log for damage, temporarily
F
42
A
H
. While supporting
B
D
and the burner
G
Sapphire Operation & Installation Manual
and the top

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents