Rinnai RIB2310MN Operation & Installation Manual page 35

Gas log flame fire
Table of Contents

Advertisement

HEATER ENGINE INSTALLATION - MASONRY
Step 4. Positioning the Heater Engine
Place the heater engine in front of the fireplace enclosure.
A panel from the cardboard packing carton
placed on the floor underneath the heater will
HINT
help prevent possible damage to flooring.
Step 5. Connect Electrical Supply
Plug in the 3 pin connector if electrical connections inside
the fireplace.
Step 6. Prepare Gas Supply
Remove the threaded brass plug from the S/S flexi pipe
consumer gas supply pipe.
Step 7. Insert Heater Engine Into Fireplace
Carefully move the heater engine into the fireplace ensuring
the gas supply pipe and fittings
hole.
Take care that the electrical cord does not
bunch up or get pinched behind the heater
CAUTION
engine.
Step 8. Securing The Heater Engine
Fasten the heater to the masonry work using appropriate
fasteners (not supplied) using the three holes across the top
of the fascia assembly mounting panel and in at least 2 of
the holes on each side of the side panels as shown
Step 9. Connecting Gas
Firmly grasp the S/S flexi pipe
approximately mid way to line up with the gas control valve
inlet
then attach pipe to gas control valve and tighten.
F
Step 10. Leak Testing
Turn gas back ON and leak test appliance connection.
Use a soapy solution to test all gas
connections. If a leak is present bubbles will
CAUTION
form at the leak point. When finished remove
any residue with a rag. Prevent any soapy
solution from coming in contact with electrical
components.
Step 11. Completing Heater Installation
Go to "COMPLETING HEATER INSTALLATION" on
page 42.
Rinnai Australia
feed into the rear access
D
.
E
and bend at 90°
D
E
F
D
F
32
D
D
Sapphire Operation & Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents