Heater Engine Installation - Console; Freestanding Console Installation Overview; Freestanding Console Installation - Detail - Rinnai RIB2310MN Operation & Installation Manual

Gas log flame fire
Table of Contents

Advertisement

HEATER ENGINE INSTALLATION - CONSOLE

FREESTANDING CONSOLE INSTALLATION OVERVIEW

Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
IMPORTANT
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Prepare Site - p.36
Step 2.
Unpack Heater Engine & Console Kit - p.36
Step 3.
Assemble & Secure Pillar Assembly - p.36
Step 4.
Attach Spigot Adaptor & Panels To Heater
Engine - p.37
Step 5.
Prepare Gas Supply - p.37

FREESTANDING CONSOLE INSTALLATION - DETAIL

Step 1. Prepare Site
Ensure the intended installation area has been prepared in accordance with dimensions as
stipulated in "GAS SUPPLY" on page 27 and "ELECTRICAL SUPPLY" on page 28.
IMPORTANT
Ensure there are no wall studs, noggins, ceiling joists, wiring or other obstruction within the wall
and or ceiling cavity where the flue is proposed to penetrate.
Step 2. Unpack Heater Engine & Console Kit
The heater engine and the console kit are supplied in separate cartons, check to ensure you have all contents as
listed on "BEFORE YOU START" on page 1 at the start of this manual before proceeding.
For heater engine remove carton by removing the straps and carefully lifting the carton off the appliance. Remove
all packaging materials and check all components for damage. If ANY damage is evident DO NOT install or operate
this appliance. Contact your supplier for advice.
Retain the card board carton for use in the "Attach Spigot Adaptor & Panels To Heater Engine" on
page 37.
HINT
Before installing the heater, check it is labelled for the correct gas type, (refer to the gas type label on the top body
panel of the heater engine). Refer to the local gas authority for confirmation of gas type if you are in doubt.
Step 3. Assemble & Secure Pillar Assembly
B
A
Assemble the pillar assembly
assembly
.
D
A panel from the cardboard packing carton placed on the floor underneath the heater engine and
console components will help prevent possible damage to flooring during assembly.
HINT
Confirm the correct gas supply position
and fasten to the floor using appropriate fasteners (not supplied) through the three holes in the base plate
Rinnai Australia
C
D
,
and
using the 4 - 8g x 10mm self tapping screws supplied creating base
A
B
C
and locate the base assembly
E
Step 6.
Fit Heater Engine To Pillar Assembly - p.37
Step 7.
Connect Electrical Supply - p.38
Step 8.
Connecting Gas - p.38
Step 9.
Leak Testing - p.38
Step 10. Completing Heater Installation - p.38
Minimum 119mm
E
in the selected installation position
D
36
F
F
Sapphire Operation & Installation Manual
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents