Completing Heater Installation; Preparing For Commissioning - Rinnai RIBF25N Operation & Installation Manual

Gas log flame fire
Table of Contents

Advertisement

COMPLETING HEATER INSTALLATION

PREPARING FOR COMMISSIONING

D
E
G
Step 1. Removing the Burner Box Glass
Loosen but do not remove the two retaining screws
the burner box glass panel in place, completely unscrew and remove the two retaining screws
burner box glass clamp
damaged.
Step 2. Unpacking the Log Set & Granules Satchel
Unpack the log set
G
The satchel containing the burner granules
contains the log set. Ensure that you locate and remove the satchel before discarding the
IMPORTANT
packaging material.
Carefully unpack the logset
DO NOT continue with installation and contact your supplier for advice.
Rinnai Australia
D
A
C
F
. Then lift burner box glass panel
E
and the burner granules
from the packaging material
G
B
H
for the bottom burner box glass clamp
A
away and place it safely aside where it can not get
C
. These are attached to the outside top of the heater engine.
H
is taped to the outside of the foam packing that
H
and inspect for damage. If ANY damage is evident
F
23
A
B
A
ENSURE TO LOOSEN BOTH
THE LEFT AND RIGHT
RETAINING SCREWS
. While supporting
B
D
Slimfire 252 Operation & Installation Manual
..
..
A
and the top

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slimfire 252Ribf25l

Table of Contents