Handling Precautions
No.
1
2
3
4
5
Note -
when PCIe cards were installed in the factory. Save these fillers and use them to cover PCIe
slots when cards are removed from the server.
Related Information
"Server Overview" on page 11
■
"Preparing for Installation" on page 21
■
Handling Precautions
Caution -
Caution -
mount this server into a rack enclosure when using the procedures in this document.
22
SPARC S7-2 Server Installation Guide • July 2016
Description
Server
Rackmount kit
Antistatic wrist strap
Printed documents
2 AC power cords
The shipping kit might also contain PCIe slot fillers that were removed from the server
Deploy the anti-tilt bar on the equipment rack before beginning an installation.
The server weighs approximately 43 lb (19.5 kg). Two people are required to lift and