Rmp Setup - Tadiran Telecom Emerald ICE Installation Manual

Digital key telephone system
Hide thumbs Also See for Emerald ICE:
Table of Contents

Advertisement

6.3
6-6
Emerald ICE Installation & Hardware Reference Manual

RMP Setup

T1 and PRI Setup
Steps 1 through 7 below describe the procedure of configuring the Emerald ICE 
system using the RMP to operate with both the T1 and PRI cards. 
The sections that follow describe additional programming if you are setting up the 
T1 card.
1. Open your Emerald ICE database file and connect with the RMP.
2. Select RP, Call Handling, Feature Control as shown below.
3. On the RP, Call Handling‐Feature Control Screen shown below, the Syn‐
chronization Source field must be 3rd BRI Slot. 
Click on the Update button to enter your settings into the RMP database.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Emerald ICE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents