Installing Method In Pue C41H Indicators - RADWAG WPW/E User Manual

Table of Contents

Advertisement

27.4.2. Colours of cables for I/O
wire number
1
2
3
4
5

27.4.3. Installing method in PUE C41H indicators

WE 4 modules are equipped in two cables, one for inputs
and one for outputs.
Installing procedure:
1. Unplug the scale from mains;
2. Unscrew and take off the back wall of the housing;
3. If inputs and outputs are installed it the same time, dismount I/O
socket and install a PG9 gland instead. LED the PT0016 cable
through it (the same way like in case of relay outputs). If only 4
inputs or 4 outputs are installed unplug one of the existing glands
and led the PT0016 cable through it.
4. Connect the PT0016 cable to the J5 connector for inputs or
to the J4 for outputs, on the main board of PUE C41H.
5. The cable connect to the group of wires (unhook band clips
fastening the group of wires, lay the cable and hook the band
clips). Band clips of multiple usage;
6. Screw down the back wall.
INPUTS
description
IN 1
IN 2
IN 3
IN 4
GND IN
OUTPUTS
wire number
6
7
8
9
10 (yellow -
green)
- 143 -
description
OUT 1
OUT 2
OUT 3
OUT 4
COMMON

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wpw/e/h

Table of Contents