InfiniBand FDR Switch Platform Hardware User Manual
When lifting manually use your legs, bend your knees, and not your back.
2. Lift the chassis and slide it onto the shelf. Use a mechanical lift or enough people to
safely lift the chassis. A full chassis weighs ~120 kgs an empty chassis weighs ~50
kgs.
Mellanox Technologies

Figure 15: The Rails are Already Connected Onto the Chassis

<40 lbs
40 - 70 lbs
<18 kgs
18 - 32 kgs
Do not use the handles on the fans for lifting or moving the chassis in the rack!
70 - 121 lbs
>121 lbs
32 - 55 kgs
>55 kgs
30