Figure 42: Management Module; Figure 43: Intact Vs Defected Signal Connectors - Mellanox Technologies MSX6512-4R. Hardware Installation Manual

216-port infiniband fdr switchx switch platform
Hide thumbs Also See for MSX6512-4R.:
Table of Contents

Advertisement

InfiniBand FDR Switch Platform Hardware User Manual
Each management module has a pair of ejectors that lock the board in place and serve as
a lever for seating or extracting (see Figure 42).
1. Run the shut down command
down management module 2 run the command below.
switch [master] (config) # no power enable MGMT2
2. Disconnect all cables connected to the management module.
3. Push outward on the ejector handles to unlock the ejectors from the chassis.
4. Open the ejectors until they are 45 degrees from the module.
5. Pull out the module half-way through the guiding rails using the ejector handle.
6. Lock the ejector handle.
7. Hold the body of the board on both sides and remove it from the chassis.
1.10.5.1 Inserting a Management Module
To insert a management board:
1. Check for foreign objects in or mechanical damage to the chassis management slots.
2. Check management mechanics for any noticeable damage.
3. Check back signal connectors' integrity. Look for any broken signal dividers or any
deviations from the pass criterion shown in Figure 43.
Mellanox Technologies
"no power enable <module>".
The board is short, therefore do not let go of it while sliding it out.

Figure 42: Management Module

I2C
CONSOLE
MGT
When hot-swapping any of the units, it is necessary to wait 1 minute after removing
the defective part before inserting the new part. This is necessary so that the manage-
ment module will start a new cycle checking through the leafs and spines for the FW
versions.

Figure 43: Intact vs Defected Signal Connectors

Pass
RST
PSU
S.FANS
L.FANS
Master
Ejectors
For example to shut
MAC
Fail
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msx6512-nr

Table of Contents