InfiniBand FDR Switch Platform Hardware User Manual
1.7.2
Installing the Cable Holder
1. Place the cable holder next to the rack, on the connector side of the chassis, and iden-
tify the holes where the caged nuts are to be placed.
Mellanox Technologies
Now is the time to install the cable holder.
Figure 10: Cable Holders
The cable holders should go to the outside of the vertical supports.
Right side cable holder
12 X M6 caged nut
12 X M6 bolt for caged nut
Left side cable holder
Cable support shelf
For each model of chassis there
is the one support shelf for every
two leafs.
26