Figure 33: Intact Vs Defected Mechanics; Figure 34: Intact Vs Defected Side Signal Connectors - Mellanox Technologies MSX6512-4R. Hardware Installation Manual

216-port infiniband fdr switchx switch platform
Hide thumbs Also See for MSX6512-4R.:
Table of Contents

Advertisement

InfiniBand FDR Switch Platform Hardware User Manual
1.10.3.2 Inserting a Spine Board
To insert a spine board:
1. Check for foreign objects in or mechanical damage to the chassis spine slots.
2. Check spine mechanics for any noticeable damage or deviations from the pass crite-
rion shown in Figure 33.
3. Check back signal connectors' integrity. Look for any broken signal dividers or any
deviations from the pass criteria shown in Figure 34 and Figure 35.
Mellanox Technologies
When hot-swapping any of the units, it is necessary to wait 1 minute after removing
the defective part before inserting the new part. This is necessary so that the manage-
ment module will start a new cycle checking through the leafs and spines for the FW
versions.

Figure 33: Intact vs Defected Mechanics

Pass

Figure 34: Intact vs Defected Side Signal Connectors

Pass
Fail
Fail
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msx6512-nr

Table of Contents