Installation - Siemens Metro 21 M216KA Operator's Manual

Distributed i/o device
Table of Contents

Advertisement

Installation

Introduction
Procedure
Installing the
1. Install the ET 200L TB 16L/TB 32L terminal block and supplementary
ET 200L
terminal
2. Install and disassemble the ET 200L electronics block
3. Set the ET 200L PROFIBUS address
Installing the
1. Install the ET 200L TB 16L/TB 32L terminal block and supplementary
ET 200L-SC and
terminal
S
t C
t
Smart Connect
2. Install and disassemble the ET 200L electronics block
3. Install the SC TB 16SC terminal block
4. Connect the Smart Connect electronic modules to the TB 16SC terminal
block
5. Set the ET 200L PROFIBUS address
6. Install a supplementary terminal and shield terminal on the TB 16SC
terminal block
Installing the
g
1. Install the ET 200L TB 16IM-SC terminal block
ET 200L SC
ET 200L-SC
2. Connect Smart Connect electronic modules to the TB 16IM-SC terminal
IM-SC and
block
Smart Connect
Smart Connect
3. Install the SC TB 16SC terminal block
4. Connect Smart Connect electronic modules to the TB 16SC terminal
block
5. Set the ET 200L PROFIBUS address on the IM-SC
6. Install a supplementary terminal and shield terminal on the TB 16IM-SC/
TB 16SC terminal block
ET 200L, ET 200L-SC and ET 200L-SC IM-SC Distributed I/O Device
EWA 4NEB 780 6009-02c
The ET 200L distributed I/O device and Smart Connect has been designed
for simple installation and wiring. To this end, the label of the ET 200L dis-
tributed I/O device and Smart Connect has been made self-explanatory.
In this chapter, you will find additional information on installing and wiring
the ET 200L distributed I/O device and Smart Connect.
A number of steps are involved in the installation of the ET 200L distributed
I/O device and Smart Connect. We suggest you adhere to the following se-
quence:
Procedure
2
Section
2.1
2.2
2.6
2.1
2.2
2.3
2.4
2.6
2.7
2.3
2.4
2.3
2.4
2.6
2.7
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents