Mechanical Installation; Mounting; Drilling Plan For Sed2 Ip20 - Siemens SED2 Commissioning Manual

Variable speed drives
Hide thumbs Also See for SED2:
Table of Contents

Advertisement

3

Mechanical installation

3.1 Mounting

3.1.1 Drilling plan for SED2 IP20

Frame size A
Frame size
A
B
C
D
E
F
Siemens
Building Technologies
Frame size B and C
W
Spacing
H in mm
W in mm
160
-
* 187
* 56
174
138
* 200
* 120
204
174
* 232
* 156
486
235
616.4
235
810
300
1110 with filter
* With footprint filter
Commissioning Guide
3 Mechanical installation
Frame size D, E and F
Mounting material
2 x M4 screws
2 x M4 lock washers
2 x M4 washers
2 x M4 nuts
or mounting on DIN rail
4 x M4 screws
4 x M4 lock washers
4 x M4 washers
4 x M4 nuts
4 x M5 screws
4 x M5 lock washers
4 x M5 washers
4 x M5 nuts
4 x M8 screws
4 x M8 lock washers
4 x M8 washers
4 x M8 nuts
4 x M8 screws
4 x M8 lock washers
4 x M8 washers
4 x M8 nuts
4 x M8 screws
4 x M8 lock washers
4 x M8 washers
4 x M8 nuts
W
Tightening
torque
2.5 Nm
2.5 Nm
3.0 Nm
13 Nm
13 Nm
25 Nm
CM1G5192en
29.07.2010
9 / 100

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents