Installation and Commissioning

Procedure / Steps
Table 3-1
Step
1. Insert the CP 443-5
Basic
Note
When using the universal rack as an extension rack, you require an IM with a communication bus link!
2. Attachment to
PROFIBUS
Note
When using the CR2 rack, the CPU and CP must be plugged into the same segment if you want to use
FDL/FMS connections.
3. Configuration
4. PG/PC Attachment
for Configuration
CP 443-5 Basic for PROFIBUS / Manual Part B3
Release 11/2002
C79000-G8976-C161-04
The CP 443-5 Basic can be inserted in all racks with slots for P and K bus
attachment:
S
Central rack CR2
S
Universal rack UR1, UR2 or UR2H
as central rack
as expansion rack with rack no. 1 -6
The CP 443-5 Basic cannot be operated in an ER1 or ER2 expansion rack
(no K bus link possible).
Suitable slots in the rack:
With the exception of the slots reserved for the power supply and IM-R, the
CP 443-5 Basic can be inserted in all slots with a P and K bus interface (in
the central or in an expansion rack no. 1 -6).
Note the information in the General section of this manual.
Depending on the communication services being used, configuration involves
the following steps:
S
Node initialization
This is necessary in all situations. This assigns a PROFIBUS address
and bus parameters to the PROFIBUS CP. For details, refer to /4/
S
Configuring connections:
This is necessary when using the communication services, S7 functions
and FDL connections (SEND/RECEIVE interface). For details, refer to /5/
or /4/.
You can connect the PG when configuring the CP as follows:
S
via MPI
S
via LAN / PROFIBUS
The CP 443-5 Basic must already have a PROFIBUS address (for details
of node initialization, refer to /4/).
Installation and Commissioning
Explanation / Meaning
B3-9