Download Print this page

Installing The Control Cables Into The Control Terminals - Danfoss iC7 Series Installation Manual

Liquid-cooled system modules, active front-end, grid converter, inverter, and dc/dc converter modules
Hide thumbs Also See for iC7 Series:

Advertisement

Installation Guide | iC7 Series Liquid-cooled System Modules
1
Figure 47: Connecting the Fieldbus Cable and the Fiber Cables
1
PLC (not included in the delivery)
3
Control board
5
Fiber cables

Installing the Control Cables into the Control Terminals

5.5
1.
Install the control cables into the control terminals.
See the pin numbering of the I/O and Relay Option in
1
2
3
Figure 48: Example of Installing the Control Cables
Danfoss Drives Oy © 2024.03
4
3
5
2
6
2
Fieldbus cable
4
Star coupler board
6
Power units
5.9 I/O and Relay Option
Connections.
AN389643231588en-000101 / 172F6360A |
43

Advertisement

loading
Need help?

Need help?

Do you have a question about the iC7 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ic7-60sl 07-236ae00f seriesIc7-60sl 07-300ae00f seriesIc7-60sl 07-334ae00f seriesIc7-60sl 07-380ae00f seriesIc7-60sl 07-425ae00f seriesIc7-60sl 07-475ae00f series ... Show all