Husqvarna DXR 95 Operator's Manual page 124

Table of Contents

Advertisement

Available languages

Available languages

3. Operate the outriggers up and down. Refer to
operate the outriggers on page 83 . The hydraulic
fluid in the system cleans the check valves.
4. Turn the valve for caterpillar track tension clockwise
and release it into closed position.
5. Operate the outriggers up and down to do automatic
caterpillar track tension.
6. Install the inspection cover.
To replace a fuse (DXR 95)
WARNING:
serious injury and death. Read the safety
instructions in this manual carefully and
make sure that you understand the
instructions before you do servicing on the
product.
1. Stop the product and disconnect the power cord.
To stop the product (DXR 95) on page 83 .
Refer to
124
To
Electricity can cause
2. Loosen the 4 screws (A) and the rear cover (B).
A
A
3. Loosen the 4 screws (C) and open the cover of the
electrical enclosure (D).
B
A
D
C
1401 - 005 - 11.01.2024

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxr 145Dxr 275Dxr 305Dxr 315

Table of Contents