Husqvarna DXR 95 Operator's Manual page 123

Table of Contents

Advertisement

Available languages

Available languages

To clean the check valves for the caterpillar
track tension (DXR 145)
1. Remove the left side cover (A).
2. Turn the lock knob counterclockwise (B).
3. Turn the valve for caterpillar track tension (C)
counterclockwise to the end position to open the
valve. This releases the pressure.
4. Operate the outriggers up and down. Refer to
operate the outriggers on page 83 . The hydraulic
fluid in the system cleans the check valves.
1401 - 005 - 11.01.2024
A
B
C
To
5. Turn the valve for caterpillar track tension clockwise
to close the valve.
6. Turn the lock knob clockwise.
7. Operate the outriggers up and down to do automatic
caterpillar track tension.
8. Install the left side cover.
To clean the check valves for the caterpillar
track tension (DXR 275, DXR 305, DXR 315)
1. Remove the inspection cover (A).
2. Pull out and turn the valve for caterpillar track
tension ¼ turn counterclockwise to lock it in an open
position (B) and (C). This releases the pressure.
A
B
C
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxr 145Dxr 275Dxr 305Dxr 315

Table of Contents