5 Emergency

During an examination, any operator can encounter two main cases of failures.

5.1 Main power supply cut

In this case, refer to

5.2 System failure

When the system fall into failure with a patient on table during an examination, the operator can
require a help with a Surgical Imaging mobile unit to finish the examination.
In this case a wall outlet single phase + ground is required to feed the mobile. It is also requires a
free space around the patient table to proceed with the mobile instead of Innova LC Positioner.
The table has to rotate to 90º.
Refer to illustration
contained in
Chapter 4, Section 2, Room Layout Drawings
82
Chapter 6, Section 17, Physical
Room Layout for Innova System (Digital Mobile Imaging System 9800)
Direction 5160944-13-1EN, Revision 2
Runs.
for a surgical imaging mobile use.
5 Emergency

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents