Grounding - GE Innova 2100-IQ Preinstallation Manual

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare

3 Grounding

A vascular lab is a critical care area and requires a special grounding system for patient safety.
An equipotential grounding system is recommended for meeting patient safety requirements.
Reference: For general system grounding requirements and information on establishing an
equipotential grounding system, refer to:
manual.
178
All shielded cables shall have a connection to ground at each extremity without
regard to the grounding to the scheme below.
Metallic covers on cable connectors shall be tested to ground.
Direction 5160944-13-1EN, Revision 2
Grounding Continuity – Job card in the Installation
3 Grounding

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents