Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Chapter 2 Innova Systems
DO NOT CONNECT THE UPS BATTERIES PRIOR THE COMMISSIONING OF
THE UPS (INITIAL POWER UP).
General safety instructions
Move the UPS in an upright position in its original package to the final
destination room.
To lift the cabinets, use a forklift or lifting belts with spreader bars.
Check for sufficient floor and elevator loading capacity.
Check the integrity of the UPS equipment carefully.
If you notice visible damage, do not install or start the UPS. Contact the nearest
Service Center immediately.
WARNING! RISK OF ELECTRICAL SHOCK: Do not remove covers; there are
no user serviceable parts inside.
All installation, maintenance and service work should be performed by qualified
service personnel.
The UPS contains its own energy source (battery).
The field–wiring terminals may be electrically live, even when the UPS is
disconnected from the utility.
Dangerous voltages may be present during battery operation. The battery must
be disconnected during maintenance or service work.
This UPS contains potentially hazardous voltages.
Be aware that the inverter can restart automatically after the utility voltage is
restored.
Direction 5160944-13-1EN, Revision 2
33