GE Innova 2100-IQ Preinstallation Manual page 250

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
All walls primed (final coat not needed on
Day 1), and counter tops that will support
8
equipment must be installed. No dust-pro‐
ducing cabinetry work in installation areas.
Mechanical supplier has been provided
with a set of equipment installation draw‐
9
ings for reference. For California, permitted
construction drawings or PMI-specified in‐
stallation drawings are required.
Conduit/electrical cable ducting/dividers/
access flooring installed, with the excep‐
tion of surface-mounted floor ducting. Wir‐
10
ing to the main disconnect panel is instal‐
led and compliant with equipment
installation drawings or pre-installation
manual.
Issued Date: 7/9/07 Rev 11
250
X
X
X
X
X
X
X
GEHC Only: COE # (888) 799.7266 Option 5 (PMI Support)
Direction 5160944-13-1EN, Revision 2
X
X
5 Pre-Installation Checklist

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents