Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Illustration 6-2: AC Interconnect with Fluoro UPS
NOTE:
Contractor responsibility:
1. Electrical contractor is responsible for providing and connecting cables from the
2. GEHC is responsible for powering on the system with the UPS in bypass mode.
3. GEDE is responsible for UPS commissioning.
Table 6-1: A, B and C cables specification
Cable
Recommended (Note (1))
A
5 X 10 mm2
B
4 X 6 mm2
C
5 X 10 mm2
Note: (1) According to local requirement.
Note: (2) According to local requirement and cable type.
166
PDB to the UPS (see table below) and configuring the PDB in bypass mode.
UPS CE version
3 ph + N + PE
3 ph + PE
3 ph + N + PE
Direction 5160944-13-1EN, Revision 2
UPS UL version
Recommended (Note
Max
5 X 3 AWG
5 X 6 AWG
3 X 3 AWG
3 X 8 AWG
5 X 3 AWG
5 X 8 AWG
(2))
3 ph + N + PE
3 ph
3 ph + N + PE
1 Power Distribution