Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
h. Connect the Fluoro UPS output cable from PDB power block 2 as follows
6-44):
•
Output load 1 to X1- L1 terminal,
•
Output load 2 to X1-L2 terminal,
•
Output load 3 to X1-L3 terminal,
•
Output load neutral to X1-N-Load terminal.
•
Ground to X1-PE-Load terminal.
2. Tie the power cables to the UPS and place the protection plates back on the UPS.
20.4 Finalization
No finalization steps.
Chapter 6 Electrical Connections
Direction 5160944-13-1EN, Revision 2
(Illustration
235