During an examination, any operator can encounter two main cases of failures.

5.1 Main power supply cut

In this case, refer to

5.2 System failure

When the system fall into failure with a patient on table during an examination, the operator
can require a help with a Surgical Imaging mobile unit to finish the examination.
In this case a wall outlet single phase + ground is required to feed the mobile. It is also
requires a free space around the patient table to proceed with the mobile instead of Innova
LC Positioner. The table has to rotate to 90º.
Refer to illustration Room Layout for Innova System (Digital Mobile Imaging System 9800)
contained in
Chapter 3 Physical Requirements of Room
Chapter 6, Section 16,
Chapter 4, Section 2,
Physical Runs.
Room Layout Drawings for a surgical imaging mobile use.
Direction 5314528-2-1EN, Revision 1
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents