Cable Routing For The Front Operator Assembly - Lenovo ThinkEdge SE350 V2 Hardware Maintenance Manual

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

Cable routing for the front operator assembly

Follow instructions in this section to learn how to do cable routing for the front operator assembly.
Figure 109. Cable routing for the front operator assembly
Note: Make sure to route the cable through the cable guide on the top of the front operator assembly as
shown in the illustration.
Cable
From
Connector on the front operator board
1
assembly
ThinkEdge SE350 V2 Hardware Maintenance Guide
134
To
OP panel connector on the system board

Advertisement

Table of Contents
loading

This manual is also suitable for:

7da97dbk

Table of Contents