Lenovo ThinkEdge SE350 V2 Hardware Maintenance Manual page 119

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

Figure 93. Lenovo XClarity Controller network access label on the pull-out information tab
 
After this task is completed
1. Proceed to install the other components of the system-board assembly.
• Install a bridge board (see
• Install an I/O module board (see
• Install a front I/O bezel (see
2. Reinstall any components that have been removed from the system board and connect all required
cables
(see related topics in
cable routing" on page
a. Reinstall the power input board module and the power main board and connect the required cables
between these two components (see
power module board" on page
board module" on page
b. Reinstall all the required memory modules (see
c. If applicable, reinstall the intrusion switch with cable and connect the cable to the system board(see
"Install an intrusion switch with cable" on page
d. Reinstall the front operator assembly and connect the cable to the system board (see
operator assembly" on page
e. Reinstall the MicroSD card (see
f. Reinstall the keylock switch with cable and connect the cable to the system board (see
keylock switch with cable" on page
g. Reinstall the drive cage and connect the required cables to the system board and the I/O module
board (see
"Install a drive cage" on page
129).
h. Connect and route all the required cables into place (see
127).
3. Proceed to complete the parts replacement (see
4. Reconfigure the server and reset the system date and time.
5. Update the machine type and serial number with the new vital product data (VPD) using the Lenovo
XClarity Provisioning Manager (see
"Install a bridge board" on page
"Install an I/O module board" on page
"Install a front I/O bezel" on page
Chapter 1 "Hardware replacement procedures" on page 1
127), such as the following.
"Install a power input board module" on page
87, and
"Cable routing for the power module board and power input
136).
59).
"Install a MicroSD card" on page
66).
50and
"Update the Vital Product Data (VPD)" on page
112).
116).
"Install a memory module" on page
62).
80).
"Cable routing for the hot-swap drives" on page
Chapter 2 "Internal cable routing" on page
"Complete the parts replacement" on page
.
Chapter 1
Hardware replacement procedures
114).
and
Chapter 2 "Internal
84,
"Install a
75).
"Install a front
"Install a
125).
117).
111