Lenovo ThinkEdge SE350 V2 Hardware Maintenance Manual page 19

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

Figure 3. Removal of the shipping bracket
(Optional) Remove the enclosure from the rack
Notes:
• Depending on the specific configuration, the node, enclosure, or rails might look different from the
illustrations in this section.
• For details of the rail options for the rack installation, see
Attention:
• Make sure to have enough help and use safe practices when lifting the enclosure.
Procedure
Step 1.
Make preparations for this task.
a.
Power off the node and disconnect all power cords from the node (see
on page
8).
Step 2.
If applicable, open the rack release latches and remove the screws that secure the enclosure to the
rails.
Figure 4. Removal of screws from rack release latches
Rack release latches
1
" Rail Installation Guides" on page
Front screw
2
.
Chapter 1
Hardware replacement procedures
179.
"Power off the server"
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

7da97dbk

Table of Contents