Processor Heat Sink Replacement; Technician Only) - Lenovo ThinkEdge SE350 V2 Hardware Maintenance Manual

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

Figure 75. Installation of the power module board
 
After this task is completed
• Reinstall the drive cage and reconnect the required drive cables (see
"Install a drive cage" on page 50
and
"Cable routing for the hot-swap drives" on page
129).
• Proceed to complete the parts replacement (see
"Complete the parts replacement" on page
125).
 
Demo video
https://www.youtube.com/watch?v=xmlPfGNjfOM
 
Processor heat sink replacement (trained technician only)
Follow instructions in this section to remove or install a processor heat sink. This procedure must be
executed by a trained technician.
CAUTION:
The heat sinks and processors might be very hot. Turn off the server and wait several minutes to let
the server cool before removing the server cover.
Attention: Before reusing a heat sink, make sure you use Lenovo proven alcohol cleaning pad and thermal
grease.
.
Chapter 1
Hardware replacement procedures
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

7da97dbk

Table of Contents