Lenovo ThinkEdge SE350 V2 Hardware Maintenance Manual page 131

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

• Remove the shipping bracket, if applicable (see
server and disconnect the power cords (see
• Remove the node from the enclosure , if applicable (see
lay the node on a flat, static-protective surface.
Procedure
Step 1.
Make preparations for this task.
a.
If applicable, remove any locking device that secures the top cover, such as a Kensington lock.
Step 2.
Remove the top cover.
a.
Remove the screw that secures the top cover on the side.
b.
Press and hold the release button on the top cover; then, slide the cover toward the rear of
the node to remove it.
Figure 100. Removal of the top cover
Step 3.
Place the top cover on a flat and clean surface.
Attention:
• The service label is located on the inside of the top cover.
• For proper cooling and air flow, either install the top cover onto the node or install the node into an
enclosure before you power on the server. Operating the node without an installed top cover might
damage the components.
 
After this task is completed
• If necessary, install a replacement unit (see
• If you are instructed to return the component, follow all of the packaging instructions and use any
packaging materials for shipping that are supplied to you.
 
"Configuration guide" on page
"Power off the server" on page
"Configuration guide" on page
"Install the top cover" on page
Chapter 1
9); then, power off the
8).
9); then, carefully
124).
.
Hardware replacement procedures
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

7da97dbk

Table of Contents