Figure 13. Installation of the inner rails
– If applicable, tighten the screws to secure the inner rails on the enclosure.
Figure 14. Installation of inner-rail screws
2. Lift and slide the enclosure into the rails.
Carefully lift the enclosure and align the enclosure with the rails on the rack; then, position
the enclosure as shown and push it into the rack.
Press the release latches.
Push the enclosure all the way into the rack until the enclosure locks into place with a
click.
.