Test the changeover device, the IT system monitoring, and the connection to the
SCADA system (Supervisory Control and Data Acquisition) (if applicable) as well as
the interaction between the components in the system.
The test encompasses the following:
– Inspection: Marking, display elements, mechanical components, wiring,
parameter setting, connection of third-party systems, evaluation of fault
memory
– Measurement: Internal/external supply voltages/potentials, bus voltage, bus
protocol, bus scan
– Testing: Device function, device communication
– Documentation: Test results, recommendations for eliminating defects
*
This test must only be performed by an authorised electrically skilled person in agreement with the medical locations
concerned.
Before carrying out the tests, please refer to the instructions relating to the functional tests in the checklist.
If no national directives apply, you should perform the tests recommended by DIN VDE 0100-710 (VDE
0100-710).
Action
COMTRAXX® CP305 - Control Panel
Carried out by
Bender
CP305_D00425_02_M_XXEN/07.2023
Interval
Every 24
months
55