D9412GV4/D7412GV4/D7212GV4
L## View Point Status
Default:
Selection:
Function No.
10
View the current status of all points in the area to which this keypad is assigned.
L## Walk Test
Default:
Selection:
Function No.
11
Walk Test all Interior or Perimeter Controlled points in the area to which this keypad is
assigned.
The following features come with the Walk Test Mode:
NOTICE!
To Walk Test a Door point connected to a D9210C Access Interface Module, open the door
without activating the door sequence or allowing it to time out past the extended shunt time.
L## Fire Test
Default:
Selection:
Function No.
12
Fire Walk Test all 24-hour points in the area where this keypad is assigned.
One person can perform a Fire Walk Test without assistance. The following features come
with the Fire Test Mode:
Bosch Security Systems, Inc.
Authority Levels 1-3, 15: Enabled (E)Authority Levels 4-14: Blank (-)
- or E
Function Name
View Point Status
Authority Levels 1-2, 15: Enabled (E)Authority Levels 3-14: Blank (-)
- or E
Function Name
Walk Test
Battery powered control panel only. A Battery Test runs during the whole test to ensure
that the battery capacity is capable of supporting the full load of the control panel if AC
fails.
This test includes 2-sec Bell Test when the Walk Test starts.
The test ends when all points are tested or the test times out after 20 min of no
activity.
Local alarm annunciation and event printing; no reports are sent to the central station
receiver.
D1255 Keypad displays a sequential count, and text after each point is activated and
restored.
The keypad displays ALL PTS TESTED and an All Points Tested Event is sent to the
central station receiver (if programmed) when the last point is tested.
If enabled in Routing, Walk Start and Walk End Reports are sent to the central station
receiver at the beginning and end of the test.
Authority Levels 1-2, 15: Enabled (E)Authority Levels 3-14: Blank (-)
- or E
Function Name
Fire Test
Battery powered control panel only. A Battery Test runs during the whole test to ensure
that the battery capacity is capable of supporting the full load of the control panel if AC
fails.
This test includes a 2-sec Bell Test (Fire Bell relay) for each Fire point that is tested.
The test ends when all points are tested or the test times out after 20 min of no
activity.
Program Entry Guide
Panel and Area Wide Parameters | en 105
Alternate Keystroke
(Menu function only)
Alternate Keystroke
[COMMAND][4][4]
Alternate Keystroke
[COMMAND][5][8]