15. Power up the server.
16. If removed, install the bezel.
The installation is complete.
Installing the ODD in SFF
Prerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
5.
Remove the access panel.
6.
Remove the media bay blank.
7.
Remove the ODD cage blank.
8.
Install the ODD into the cage.
Hardware options installation