Extending The Server From The Rack - HPE ProLiant DL325 Gen10 User Manual

Table of Contents

Advertisement

Extending the server from the rack

To perform this procedure, you will need a T-25 screwdriver.
NOTE: If the optional cable management arm option is installed, you can extend the server without powering down the
server or disconnecting peripheral cables and power cords. These steps are only necessary with the standard cable
management solution.
WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately
stabilized before extending a component from the rack.
WARNING: To reduce the risk of personal injury, be careful when pressing the server rail-release latches and sliding
the server into the rack. The sliding rails could pinch your fingers.
Procedure
1. If installed, remove the bezel.
2. Power down the server.
3. Disconnect all peripheral cables and power cords.
4. Do the following:
a. Open the latches on both sides of the server.
b. If necessary, use a T-25 Torx screwdriver to loosen the shipping screws.
c. Slide the server out of the rack.
Operations
29

Advertisement

Table of Contents
loading

Table of Contents