8.
Install the FlexibleLOM adapter.
9.
If removed, install the primary riser cage.
10. Install the access panel.
11. Install the server into the rack.
12. Connect all peripheral cables to the server.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server.
The installation is complete.
Hardware options installation
85